Home›Journal
signal · written.

The Journal.

Announcements, engineering notes, and perspectives from TELECIS — written in the same voice as the specifications, because it is the same discipline. Every piece lists its sources and its reviewer: how we write.

JOURNAL
SOURCEPAGEEYE - SOURCED, NOT ASSUMEDWRITTEN UPTCLAIMS CARRY THEIR SOURCES
From the source to the page — evidence first, prose second.
REGULATION4 November 2026

The R-number: what to check for BIS registration in an AV submittal.

Under MeitY's compulsory registration order, much of the hardware in an Indian meeting room must carry the BIS Standard Mark with its own R-number. Which AV items are notified, which the list does not name, how to verify a number, what the label shows — and a submittal checklist.

→
ENGINEERING4 November 2026

USB at the display end: what a BYOM room asks of the link.

In a bring-your-own-meeting room the camera, speakerphone and touch overlay sit at the display and reach the laptop over an extender's USB 2.0 channel. What 480 Mb/s means in practice, why the isochronous figure is the one that counts, which camera formats fit — and how to write the link into a specification.

→
ENGINEERING2 October 2026

CAT5e, CAT6, CAT6A: what an HDBaseT reach figure assumes.

The HDBaseT Alliance's own reach figures change with the cable. What a 70 m or 100 m figure assumes — category, solid core, shielding, terminations, patch points, bundling — and how to write it into a specification.

→
NETWORKS2 October 2026

The switch decides: a network checklist for 1G AV-over-IP.

Whether 1G AV-over-IP works is decided at the switch. A question-by-question checklist — snooping, querier, unregistered multicast, fast leave, uplinks, PoE, QoS — for integrators and the IT team hosting it.

→
STANDARDS2 October 2026

What IPMX certification leaves to the buyer.

IPMX certification records what was tested. The decisions it leaves to the buyer — profile per position, network class, PTP, and what a listing does not cover — decide whether a multi-vendor system works.

→
PLATFORM7 September 2026

Two ways to be visually lossless.

JPEG XS and JPEG 2000 are both intra-frame, and both are sold with the same three words. They are opposite engineering trades, and the one you want is decided by the room, not by the brochure.

→
STANDARDS4 September 2026

Interoperability you can look up.

Every manufacturer's literature says interoperable. Almost none of it says who tested that, against what, or where you can read the result — which is the only version of the word that survives a commissioning week.

→
REGULATION28 August 2026

11 September 2026: cyber rules reach the AV rack.

Under the EU Cyber Resilience Act, reporting obligations for connected products begin on 11 September 2026, with full obligations following in December 2027. Networked AV equipment is in scope — and procurement will start asking. Here is what to ask, and what to write into the specification.

→
ENGINEERING26 August 2026

The distance figure — and its footnote.

Every reach figure on every extender datasheet — ours included — is true under the conditions printed next to it. Installed reach is the figure minus the room. Here is how to do that subtraction before the conduit is poured.

→
PERSPECTIVE24 August 2026

AI reaches the meeting room. The signal path still decides.

Industry research this year puts AI adoption in pro AV at nearly two-thirds of organisations — and the same conversations acknowledge a gap between what the features promise and what room infrastructure delivers. Both facts are useful.

→
STANDARDS22 August 2026

Ultra96: what HDMI 2.2 changes on site — and what it doesn't.

The HDMI Forum's 2.2 specification doubles the ceiling to 96 Gbps and makes cable certification mandatory. The second half of that sentence is the part that changes your installations this year.

→
CHANNEL20 August 2026

Qualifying an AV manufacturer before you specify it.

A working checklist for integrators evaluating an AV manufacturer they have not specified before — seven answers to get in writing before the first unit is ordered.

→
CHANNEL19 August 2026

Issued, not downloaded.

Why TELECIS datasheets arrive from a person: version discipline, a second pair of eyes on your room, and a desk that knows who is specifying what.

→
ENGINEERING17 August 2026

USB-C is a promise the room must keep.

One connector implies three contracts — video, data, power. Huddle rooms fail when the wall keeps only one of them and nobody wrote down which.

→
METHOD14 August 2026

Commissioning is a signature.

A room is not finished when it works. It is finished when a named engineer signs a record stating what was verified, in what order — and that document goes on working for years.

→
PLATFORM11 August 2026

The middle path: JPEG2000 at 1G.

Between uncompressed 10G and long-GOP H.26x sits the tier most rooms actually need — visually lossless, intra-frame, and honest about what it asks of the network.

→
ENGINEERING8 August 2026

De-embed at the output.

Audio should leave the matrix with the video it belongs to — coaxial and analogue L/R at every output — not through a shelf of external extractors that each brought a power supply and an opinion about EDID.

→
SPECIFICATION5 August 2026

The zero in 404.

TC model numbers are built to be read at 11pm on a tender deadline — series, configuration, transport, qualifier, with a zero you can parse instead of a lookup table you can't.

→
ANNOUNCEMENT30 July 2026

Introducing TCE — certification with nothing hidden.

The TELECIS Certified Engineer programme is published: a free online Core, a two-day practical Advanced, vertical Specialist endorsements — and every standard published.

→
PERSPECTIVE10 July 2026

Engineered to be specified.

Why TELECIS exists — and why the brand promise is written in the language of consultants, not campaigns.

→
New entries are announced to the specification list.

Ask to be added →
Reading done?

Specify with us.

The Journal explains the thinking; the catalogue carries the proof.